THE FOLLOWING PAGES ARE EXAMPLES OF ONLY A SMALL PORTION OF THE RENOVATION AND CONSTRUCTION I'VE DONE. THE INVENTION OF THE DIGITAL CAMERA HAS HELPED ME DOCUMENT MY LABORS, SO MOST PHOTOS ARE WORK FROM THE LAST 5 YEARS (Eventually, I hope to scan and add snap-shots from ten to fifteen or more years ago renovating my old 5,500 sq. ft. church studio and skidding logs on the Michigan property which would eventually be used as "Cordwood" construction material for the Colorado house).

JAN. 2004 REMODELING:

STEVE & SHARON LARSON

380 HIGH SPIRIT TRAIL

WESTCLIFFE, CO. 81252

Clearing Furniture out of great-room.

Bringing Beams for Loft into house.

Welding Angle Iron Brackets for Loft Beams. Over 200 bolt holes were made with welding/cutting torch.

Grinding sharp edges off brackets.

Spray painting brackets black.

Hoisting floor joists into place.

Close-up of my custom made angle-iron brackets under loft extension.

 

 

 

Completed loft extension.

West peak before insulation & studs.

West wall peak framing & Insulation.

Standing on new loft area while insulating & dry-walling west peak.

New enclosed stair-steps & stud wall & chipboard for hand-peeled pine.

JAN. 30TH to FEB. 9TH REMODELING PHOTOS

Steve & Sharon Larson

380 High Spirit Trail

Westcliffe, CO. 81252

Sunroom before French Doors & Drywall Installed & Heater moved.

Sunroom after French Doors, etc.

Before Peeled-Pine installed on wall.

After Peeled-Pine wall panel installed.

Jan. 30th, framing West wall to insulate.

Insulation installed on West wall.

Planning bark off of vertical rail-posts.

 

Sandblasting vertical rail-post supports.

Assembling 1st section of loft railing.

Completed loft railing.

Installing loft Peak drywall & done below.

REMODELING PHOTOS FOR FEB.10TH TO 25TH, 2004

Steve & Sharon Larson, 380 High Spirit Trail, Westcliffe, CO, 81252

North side of Bedroom BEFORE French Doors & Closet Wall.

 

Bedroom AFTER French Doors Installed & North closet Dry-walled.

 

Half Bath Door installed BEFORE triangle wall & Skylight framed-in.

 

AFTER half-bath triangle wall & window installed.

South walk-in closet wall BEFORE it was framed & dry-walled.

AFTER South walk-in closet framed & dry-walled.

Vanity sitting in Half-Bath BEFORE drywall & plumbing finished.

Plumber working on Vent Pipes for Half-Bath.

Hallway & Sharon’s office BEFORE two closet doors and her new office door were installed.

AFTER three (2 closets & Sharon’s office Door) Hallway doors installed.

Wall in Great-room off hallway dry-walled downstairs.